Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter collar, DGL Clearance was called into TEP Pending solar |
|
| 04/18/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |