Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | BULD - Electrical Clearance | Partial Pass | Partial approval for the 200A service panel upgrade, INCR Clearance was called into TEP at 3:15pm (eliminate 1 meter) Pending solar |
|
| 07/10/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |