Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the service panel upgrade, INCR Clearance was called into TEP at 11:15am Pending solar |
|
| 03/11/2024 | BULD - Electrical Clearance | Re-inspection required | Texted at 7:30am, called twice at 7:37am... No answer. | |
| 03/13/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |