Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/27/2023 |
RSBU - Building Final |
|
Re-inspection required |
6/27/23: 1)connections from non-metallic pipe to metal pipe need to be taped off for corrosion purposes. 2)self closing gate is not installed |
| 12/14/2023 |
RSBU - Building Final |
|
Passed |
|