Inspection History Details
Inspection Status: Partial Pass
Inspection History: Pool/Spa - Plumbing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2023 | Pool/Spa - Plumbing | Partial Pass | not ready. send plans for revision for site plan and pool equipment area. not matching what we have in the field according to the plans. 3/29/2023 plumbing lines under pressure. yard water lines needs to be embedded in shading minimum 3 - 6 inches due to rocky soil. trench needs to stay open for next inspection. |
|
| 04/04/2023 | Pool/Spa - Plumbing | Partial Pass | ||
| 05/09/2023 | Pool/Spa - Plumbing | Passed |