Inspection History Details
Inspection Status: Partial Pass
Inspection History: Pool/Spa - Bonding Grip
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2023 | Pool/Spa - Bonding Grip | Partial Pass | not ready. send plans for revision for site plan and pool equipment area. not matching what we have in the field according to the plans. 3/29/2023 bonding grips are in place. |
|
| 04/04/2023 | Pool/Spa - Bonding Grip | Passed |