Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-RES-0123-02386

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Partial Pass

Date Description Inspector Results Comments
05/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 5/7/24: girder truss missing sufficient support (add 2x's at multiple locations).
08/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/7/24: girder truss missing sufficient support (add 2x's at multiple locations).
8/9/24: seal all penetrations through top plate and vapor barrier, Nail plates required throughout, 18" of copper required before transitioning to pex at water heater, DWV not under test, smoke detector missing outside bedrooms, blocking required at 4-gang box, wire size not per plan throughout, receptacles at bedroom missing at 5' A.F.F, Chimney vent must have a 2" clearance from combustibles, flex must be R-8 if outside of building thermal envelope, kitchen island not installed at time of inspection, STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
08/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/7/24: girder truss missing sufficient support (add 2x's at multiple locations).
8/9/24: seal all penetrations through top plate and vapor barrier, Nail plates required throughout, 18" of copper required before transitioning to pex at water heater, DWV not under test, smoke detector missing outside bedrooms, blocking required at 4-gang box, wire size not per plan throughout, receptacles at bedroom missing at 5' A.F.F, Chimney vent must have a 2" clearance from combustibles, flex must be R-8 if outside of building thermal envelope, kitchen island not installed at time of inspection, STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
8/27/24: per previous note.
09/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/17/2024 approved.