Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSEL - Electrical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2023 | COT - RSEL - Electrical FinalĀ | Passed | 5/11. Generator installed with existing solar and 2 batts. Transfer switch approved for AG. |