Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2023 | RSBU - Building Final | Re-inspection required | 4/7/23- Electrical plans not provided 4/7/23- Needs 100Amp Lockout Disconnect |
|
| 04/17/2023 | RSBU - Building Final | Passed |