Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 01/02/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Approved corrections were made. Revisions will be completed prior to finals. 1/2/2025 |
| 10/01/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
garage |
| 12/31/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
Partial pass. Pending DWV test. Secure ABS midway throughout. Add two receptacles in hallway. Provide manufacture specs on water heater install to verify termination to the appliance. Revise set of drawings prior to final of all the changes that have been made in the field. Including panel in laundry room. (SFR inspection) 12/31/2025 |