Permit: TC-RES-0123-02358

Parcel: 130111900


Addresses:

2019 S HOLLY SV

Inspection Status: Passed

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
08/06/2025 COT - RSBU - Roof Nailing  Passed
08/28/2024 COT - RSBU - Roof Nailing  Re-inspection required 8/28/24: anchor bolts spacing not per plans, anchor bolts shall be placed no more than 12" from edge of sill plate, sheathing must be properly fastened at south west corner of garage, beam to post connection at garage calls for Simpson ACE6 clip, shot pins at non bearing wall not per schedule (spacing is greater than 48" o.c and greater then 6" from edge of bottom plate, framing not per plans (door opening for storage room covered and storage room not framed, shearing on exterior not completed on west side of garage, ensure vents are installed.
09/04/2024 COT - RSBU - Roof Nailing  Partial Pass 8/28/24: anchor bolts spacing not per plans, anchor bolts shall be placed no more than 12" from edge of sill plate, sheathing must be properly fastened at south west corner of garage, beam to post connection at garage calls for Simpson ACE6 clip, shot pins at non bearing wall not per schedule (spacing is greater than 48" o.c and greater then 6" from edge of bottom plate, framing not per plans (door opening for storage room covered and storage room not framed, shearing on exterior not completed on west side of garage, ensure vents are installed.
9/4/24: partial pass at garage for framing and roof nailing