Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2023 | BULD - Electrical Clearance | Not Ready | 4/10/23- Material not Delivered Reschedule required 4/10/23- TEP RECN Verbal Clearance @8:47am |
|
| 07/07/2023 | BULD - Electrical Clearance | Partial Pass | Partial for MPU, INCR Clarance was called into TEP at 12:50pm (power-kill) - Pending Solar | |
| 07/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |