Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | DWV and tubs on test. Extend electrical boxes at party walls to be flushed with 5/8". Provide 18" of copper at both main water lines along with water heater from 1st sweat joint. Ensure lath is in place prior to next intermediate inspection. 3/20/2026 | |
| 04/01/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 4/1/26 1. Bedroom 2 window is too high. |
|
| 06/01/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 06/01/2026 Corrections made to prior inspections. |