Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | ENGR Engineering Final | Not Ready | Unit 1 needs Air leakage and duct tightness condition satisfied prior to final. Submit report document to the building permit. Accessible Route Landing in front of entryway does not comply to 2017 ICC A117.1 Figure 404.2.3.2(B) Reschedule inspection when ready |
|
| 07/28/2026 | ENGR Engineering Final | Not Ready | Site is complete. Air Leakage & Duct Tightness condition on permit still is not satisfied. | |
| 08/03/2026 | ENGR Engineering Final | Passed |