Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
Permit Number - TC-MDP-1225-00753
Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 3-2-26: add nails along edges between 3/8" to 1/2" max from edges/joints, shear wall 6 & 7-add nails 3" o.c. Along edges/joints & anchor bolts must be 5/8" at 24" o.c., add shot pins at interior sill plates 6" from the ends of each plate with a minimum of 2 per plate, add anchor bolts at marked locations, see top plate splice details and nails according to plans, add nails to cs straps interior glulam beam north of stairs, stair detail calls for 3-16d nails at each stud-add accordingly, add tighten bolts at stair sill plate 24" o.c., add a35's at the top of stringers, missing 4x6 post together with lag screws per details 160 & 161 on page S3.1B 2nd floor down to foundation, add lus 24's to trusses JH4,/JE4A-per truss calcs., add nails along edges/base of parapets per schedule, add nails to sill plate to decking 2nd floor at marked locations, upstairs balcony missing nails at 16" o.c. Along ledger, missing 4x6 post flat entryway, 4x6 at garage shear wall doesn't go all the through decking-requires bearing all the way to foundation, missing lag screws at post to beam connection back patio. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE ADDED. | |
| 03/09/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required (with fee) | 3.9.26 truss hangers still missing at je4a (x3) as previously noted Engineer letter required for 4x6 and 4x4 continuous load to foundation detail near stairs Reinspection with fee required |
|
| 03/12/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required (with fee) | 3-12-26:cs strapping at exterior walls per sd3/details 1& 5 not per plans, missing anchor bolts-add to marked locations, top splice -add nails per plans, missing tighten bolts at stair sill plate together with a-34's at top of stringers-see previous inspection notes from 3/2/26. Stopped inspection, reinspection fee applies. | |
| COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Scheduled |