Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
Permit Number - TC-MDP-1224-01407
Inspection Description - COT - RSBU - Roof Nailing
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2025 | COT - RSBU - Roof Nailing | Re-inspection required | Add anchor bolts per shear wall schedule. Add nails at ledger near entry way. Double studs need to be underneath girder trusses at powder room. Blocking needs corrections at bearing trusses. Add studs underneath girder truss 1st floor for continuous load transfer. Truss FG5 calls for 3 bearing points. Add h25 and supports. Floor trusses that call for bearing points need to be shimmed. Stopped inspection other items may apply. 4/10/2025 | |
| 04/15/2025 | COT - RSBU - Roof Nailing | Passed | 4/15/25 corrections made |