Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
Permit Number - TC-MDP-1224-01405
Inspection Description - COT - RSBU - Roof Nailing
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 4/29/25: Anchor bolt spacing not per plan at shearwalls, 3"x3" washer plates required at SHearwall 11 and greater, fasteners not per schedule throughout, any sill plate 12" or greater require 2 Anchor bolts minimum. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
| 05/09/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 5/8/25 see previous notes | |
| 05/13/2025 | COT - RSBU - Roof Nailing | Re-inspection required (with fee) | 5/13/25 1. Whole house is covered in lathe, please remove lathe at all shear walls for fastener inspection. |
|
| 07/11/2025 | COT - RSBU - Roof Nailing | Partial Pass | 4/29/25: Anchor bolt spacing not per plan at shearwalls, 3"x3" washer plates required at SHearwall 11 and greater, fasteners not per schedule throughout, any sill plate 12" or greater require 2 Anchor bolts minimum. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 5/8/25 see previous notes 5/13/25 1. Whole house is covered in lathe, please remove lathe at all shear walls for fastener inspection. 7/11/25: Home has been completely lathed and insulated. Roof has been completely dried in and loaded. Intermediate inspections were never called in. Letters from all contractors will be required to ensure construction meets or exceeds the 2018 irc. Holdowns and anchor bolts were verified by removal of insulation. DWV was tested at open walls. |
|
| 09/23/2025 | COT - RSBU - Roof Nailing | Passed |