Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2025 | ENGR Engineering Final | Not Ready | Install Riprap as needed to stabilize slope to east of driveway. Area is getting washed downgrade into Storm Drainage. Trim cleanouts that are trip hazards in that area as well. |
|
| 10/07/2025 | ENGR Engineering Final | Passed |