Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
Permit Number - TC-MDP-1224-01398
Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
Inspection Status - Canceled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Canceled | 6/2/25 Canceled. |
|
| 06/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Re-inspection required | 6-3-25: add anchor bolt/washer garage shear was-anchor bolts to be placed at 17" o.c. Add shot pins to marked location, and nails along edges/joints at exterior rim board sheathing throughout including-see nail spacing for details and add nails where overpenetrated (cannot over penetrate more than 1/8").Upper floor: add nails at sill plate to decking-south shear wall, and nails to to shear wall base at north shear wall, and nails to sill plate to decking at marked locations-STOPPED INSPECTION -ADDITIONAL ITEMS MAY BE ADDED. | |
| 06/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Partial Pass | 6/2/25 Canceled. 6-3-25: add anchor bolt/washer garage shear was-anchor bolts to be placed at 17" o.c. Add shot pins to marked location, and nails along edges/joints at exterior rim board sheathing throughout including-see nail spacing for details and add nails where overpenetrated (cannot over penetrate more than 1/8").Upper floor: add nails at sill plate to decking-south shear wall, and nails to to shear wall base at north shear wall, and nails to sill plate to decking at marked locations-STOPPED INSPECTION -ADDITIONAL ITEMS MAY BE ADDED. 6/6/25: Garage shear wall 13 not complete ( washers must be 3'X3", fasteners not per schedule, hold down missing at garage (provide engineer fix with RFI), fasteners not per plan at closet shearwall up stairs. Ok to proceed will verify corrections at intermediate. |
|
| 06/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Canceled | ||
| 06/23/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Canceled | ||
| 06/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/24/24 corrections made |