Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-1224-01382
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2025 | ENGR Engineering Final | Not Ready | 7/22/25 At lot 159 (224 Sunny Cove PL) at SW corner of house has 1/1 gunnite slope treatment that ends adjacent to the property line. In fact it looks steeper that 1/1 where it ends. The dumped riprap at the transition is being undermined by erosion because the slope is too steep for dumped riprap. The detail in the development package calls for grouted riprap at this area in cross section AA/27. Then use the table of for typical slope treatments for the rest of the slope. This issue has potential to affect property until it is corrected |
|
| 07/28/2025 | ENGR Engineering Final | Passed | Grouted rip rap slope in place at the end of the shot-crete channel. Erosion rill has been repaired. Remove all Nursery cane stakes from trees. |