Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2026 | ENGR Engineering Final | Not Ready | 1. Drainage is not sufficient. There needs to be positive drainage away from the house. 2. The Drainage needs to be able to flow out from the back of the lot to the front and into a larger depression in front of the house. This depression should be further west towards the sidewalk and away from the house. Dirt removed from the depression and swales should be spread along the edge of the house to aid in positive drainage away from house or removed from site. Both the North and South side yard swales are not deep enough to provide adequate drainage. |
|
| 05/08/2026 | ENGR Engineering Final | Re-inspection required | No change from last inspection. See note 1 on Site plan. | |
| 05/15/2026 | ENGR Engineering Final | Passed |