Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 04/29/2025 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
Anchor bolts are loose throughout. Add shot pins at marked areas interior bottom plates. Missing bracing at both A1 and A4 trusses per truss calcs. Loose sheathing at shower in primary bath. Perimeter nailing not per schedule at window in flex room. A7.0 detail 206, 207, and 213 not per plan. 4/29/2025 |
| 05/01/2025 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
Per previous notes. 5/1/20205 |
| 05/06/2025 |
COT - RSBU - Roof Nailing |
|
Passed |
|