Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2024 | ENGR Engineering Final | Not Ready | Landscaping not finished | |
| 08/20/2024 | ENGR Engineering Final | Not Ready | Clean out to high and creates a trip hazard. Just to note; DG on right side of yard needs to be fixed, damaged by landscapers. Street inlet still not repaired. |
|
| 08/21/2024 | ENGR Engineering Final | Passed |