Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 03/06/2023 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Not Ready |
Workers still in house, not ready for inspection |
| 03/07/2023 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Not Ready |
Not ready. Missing shear wall 1st floor. Shear wall in great room in the wrong place. Add continuous studs for double truss. Nailing schedule on shear walls need to be completed. Nail every 16” on all perimeter in second floor bottom plate. Missing rsp clips on studs and headers. |
| 03/10/2023 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
Approved. Corrections were made. 3/10/2023 |