Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2023 | RSBU - Building Final | Re-inspection required | 9/28/23: condensation at water heater must be 6" above grade | |
| 09/29/2023 | RSBU - Building Final | Passed |