Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/29/2026 ENGR Engineering Final Not Ready HCS collar for plug cap need to be glued to pipe so it is sealed. The end of the pipe needs to be trimmed because it not a clean enough perpendicular cut to allow for seal.
Outstanding conditions need to be satisfied prior to final:
-Sewer release
-Post tension, inspection report
-Post install installed an anchor report
-Concrete install installation
-Air leakage & duct tightness
07/31/2026 ENGR Engineering Final Not Ready 7/31/26
Below are notes from previous Engineering inspection.....
-HCS collar for plug cap need to be glued to pipe so it is sealed. The end of the pipe needs to be trimmed because it not a clean enough perpendicular cut to allow for seal.
-Pipe was not trimmed so when it was glued the notch at the end of the rough cut pipe is open below the collar. It is not sealed. This needs to be corrected.
-Not all conditions are satisfied prior to final yet.
08/04/2026 ENGR Engineering Final Passed