Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/18/2025 |
RSBU - Building Final |
|
Re-inspection required |
12/18/25: AFCI required at garbage disposal/dishwasher, grade must be corrected, WR receptacle required outdoors, GFCI receptacle required at laundry room, water hammer arrestor shall not be painted, mark air handler to verify correct amperage at disconnect box, verify condensate pump to be tied into air handler, secure electrical riser at main panel, insulate hot water line at water heater, post tension tag required at hose bib, roof drain must be re-routed pending on 5409, |
| 12/19/2025 |
RSBU - Building Final |
|
Passed |
|