Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/03/2025 |
ENGR Engineering Final
|
|
Not Ready |
Verify positive drainage. east side does not appear to drain to the front. cross slope issues with sidewalk panels. verify no panels exceed 2% cross slope. |
| 10/09/2025 |
ENGR Engineering Final
|
|
Passed |
|