Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
10/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 10-1-25: seal vapor barrier at several areas along southside of garage and behind awg wires on northside, provide blocking using a 2x4, osb, drywall between pex line at master bathroom-a 12" clearance between can lights & pex is required, tape tear to flex at master bedroom, provide a minimum of 2 screws to each side of pex wall support bracket in both bathrooms.
10/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.2.25
Corrections made