Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10-1-25: seal vapor barrier at several areas along southside of garage and behind awg wires on northside, provide blocking using a 2x4, osb, drywall between pex line at master bathroom-a 12" clearance between can lights & pex is required, tape tear to flex at master bedroom, provide a minimum of 2 screws to each side of pex wall support bracket in both bathrooms. | |
| 10/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.2.25 Corrections made |