Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 7-29-25: missing knockout at panel 1, label each panel" non metallic plumbing", missing EV breaker/label and label on panel indicating future PV/solar. NOTE: break off screw on vacuum breakers to avoid theft. |
|
| 08/04/2025 | COT - RSPL - Plumbing Final | Passed | 8-4-25: plumbing final approved. |