Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to finish the last course of block in the very back on the right side | |
| 05/01/2025 | ENGR Engineering Final | Passed |