Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
07/18/2025 BULD - Electrical Clearance Re-inspection required 1-Each Grounding Electrode conductor must connect to grounding electrodes unsliced.

2-Each service riser requires two braces between service and roof.
07/24/2025 BULD - Electrical Clearance Re-inspection required Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025
07/25/2025 BULD - Electrical Clearance Passed Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025

7-25-2025
Meter base replaced with new one. Unistrut clamp added to riser. Approval TEP ECO Unit 1 & 2.
07/25/2025 BULD - Electrical Clearance Re-inspection required Not ready. Meter base has been painted. It cannot be cleaned and has to be replaced. 7/24/2025

7-25-2025
Not ready per prior inspection on 7-24-2025.
07/30/2025 BULD - Electrical Clearance Passed 7/30/25
TEP CLEARANCE: ECO, UNITS 1,2,3,4.