Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2024 |
ENGR Engineering Final
|
|
Not Ready |
Water meter cover, sewer cleanout cover not installed. Please submit revised site plan showing accurate gate & wall locations. |
| 06/07/2024 |
ENGR Engineering Final
|
|
Passed |
|