Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to finish the subdivision per plan | |
| 02/20/2025 | ENGR Engineering Final | Passed | Buildings 85 through 87 are good |