Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-1025-00634

Parcel: 140281200

Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
09/15/2026 RSBU - Building Final  Re-inspection required 9-15-26 HCS Loose at driveway entry is required to be glued down properly* condensing pad must have 3 inch clearance on all sides *no receptacles under island countertop when countertop is extended past 9 inches from wall, blank is required* unable to properly inspect attic due to no ladder. Reinspect is required.
09/18/2026 RSBU - Building Final  Partial Pass 9-18-26 All previous items have been corrected building final partial pass, pending conditions to be satisfied