Permit: TC-MDP-1025-00631

Parcel: 140281240

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
05/29/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5-29-26: ground pancake box at coach light, seal vapor barrier at garage, master bedroom closet, and at east side of entryway, fire foam penetration at west wall top plate in master bedroom, tape tear to flex at makes area of kitchen & at living room.
06/01/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-1-26: intermediates approved. Okay to continue with construction at progress areas.