Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/08/2025 |
ENGR Engineering Final
|
|
Not Ready |
Gate and CMU pilaster for gate attachment are missing, rebar is in place, block is missing. |
| 07/09/2025 |
ENGR Engineering Final
|
|
Passed |
Site is safe and complete in accordance with approved plans. |