Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2025 | ENGR Engineering Final | Not Ready | Driveway aprons missing, no ground cover installed, crews still working, equipment still on site. | |
| 06/24/2025 | ENGR Engineering Final | Not Ready | Gravel needs to be even depth. it is not 2” by ROW sidewalk. Traffic cones need to be removed. |
|
| 06/25/2025 | ENGR Engineering Final | Passed |