Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
04/04/2025 COT - RSBU - Roof Nailing  Re-inspection required 4 April 25
1. Damaged sill plate behind bathtub, please add anchor bolts no closer than 3.5 inches for 1/2 and 4.5 inches for 5/8 AB.
2. Shot pins needed throughout marked with an x with circle around it. Do not use cut nails.
3. Truss CG48C per plan requires H2.5 on the bottom chord.
04/08/2025 COT - RSBU - Roof Nailing  Re-inspection required 3. Truss CG48C per plan requires H2.5 on the bottom chord.
04/10/2025 COT - RSBU - Roof Nailing  Passed 4/10/2025 corrections were made.