Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 03/11/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
3-11-25, letter submitted from Austin Electric has not yet been reviewed nor approved by the city. |
| 03/12/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
3/12/25 letter needed for cfo |
| 11/12/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
11-12-24, metal pancake box for exterior light near garage is overfilled. Box contains to 14/2 awg and is rated for 6 cubic inches, shower upstairs not under test, seal staples at vapor barrier in bedroom 2. |
| 11/14/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
11-14-24. Items from previous inspection made. Okay to proceed at own risk. Electrical not per approved plans. Provide a letter from Austin electric together with a schematic of electrical layout. These items must be submitted, reviewed and approved by the city prior to a certified of occupancy can be issued. |