Inspection History Details
Inspection Status: Canceled
Inspection History: COT - BULD - SWG Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2024 | COT - BULD - SWG Clearance | Canceled | 3/28/24: canceled per contractor | |
| 04/02/2024 | COT - BULD - SWG Clearance | Re-inspection required | Pex line connections to copper line must be min. 18” away from next soldered joint per M2105.10.2, duct registers must be blocked on 3 sides. 3/28/24: canceled per contractor 4/2/24: pex line connection to copper still not at min 18" of copper. |
|
| 05/30/2024 | COT - BULD - SWG Clearance | Passed |