Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2024 | ENGR Engineering Final | Not Ready | Evidence of pooling of the drainage from the rear yard to the front, please provide certificate or something that shows positive drainage is per plan. Nursery stakes at trees need to be removed and the proper tree stakes used. This is seen in several yards throughout the project. Clean out in front yard is too high and needs to be cut down to eliminate the trip hazard. |
|
| 07/18/2024 | ENGR Engineering Final | Passed |