Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Pex lines must be 18” away from next soldered joint at water hose and water heater appliances per M2105.10.2., foam penetrations at vapor barrier, block registers on 3 sides, electric not finished at kitchen island, fire foam missing for duct chase second floor, bathroom door frame too narrow, plumbing not per P1 plans. |
| 04/15/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
Electric not finished at kitchen island, check for refrigerator being on its own circuit, bathroom door frame too narrow, plumbing not per P1 plans. Partial-pass. Ok to insulate. Check at re-inspection. |
| 04/17/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
Plumbing not per plans. Make proper corrections according to plans or revise plans showing current layout of plumbing work done and provide updated city stamped plans at Final. Partial-Pass. Ok to proceed at risk per Ernie Stevens. |
| 07/15/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|