Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 09/14/2026 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
9/14/26: fasteners shall be 3/8" from edge of panel, tighten anchor bolts at garage, SD2/2 detail blocking missing at garage SE wall, osb between 1st and 2nd floor shall be fastened 3" o.c, ab spacing greater than 6' o.c at west wall, tapcons required at stair bottom plate, loose a.b throughout at marked locations, 1 in 3 masa clip allowed with 1 leg up marked, ledgers must be fastened to ribbon truss (currently attached to osb), frame at stringers not properly bearing on wall perpendicular to t-ply. shot pins required 32" o.c at interior non-load bearing walls, STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 2nd floor has not been walked. |
| 09/21/2026 |
COT - RSBU - Roof NailingĀ |
|
Partial Pass |
9-21-26 All previous items marked have been corrected. OK to proceed partial past pending engineering repair on broken trust at primary bedroom |