Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Tighten loose bolts at marked areas. Make up electrical boxes for out door lighting. Ensure ground screw makes contact to box. Add clamp to solar pre wire tube. Add nail plates to marked areas. Move over receptacle right of range to be within 2'. Add receptacles to north bedroom. Add receptacles to primary bedroom both walls. Marked areas. Staples punctured abs line in vent line at primary bathroom. 10/9/2026 | |
| 10/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/15/2026 All corrections made. |