Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2026 | ENGR Engineering Final | Not Ready | There are a conditions and special inspections that need to be satisfied prior to final. HCS cap collar needs to be glued correctly at clean out in driveway. | |
| 07/01/2026 | ENGR Engineering Final | Re-inspection required | -HCS cap fixed but Conditions still not Satisfied -Unsatisfied conditions required prior to final: Concrete installation- special inspections Epoxy anchors- special inspections Post tension- slab special inspections Site Preparation- special inspections -When conditions satisfied schedule Engineering Final |
|
| 07/10/2026 | ENGR Engineering Final | Passed |