Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | ENGR Engineering Final | Not Ready | 3/19/26 HCS collar in drive way needs to glued to pipe. |
|
| 03/23/2026 | ENGR Engineering Final | Re-inspection required | HCS in Driveway still not correct. West side yard DG at A/C and drain block needs to be fixed to prevent pooling storm water. Move dumpster away from front of home | |
| 03/25/2026 | ENGR Engineering Final | Passed |