Permit: TC-MDP-0925-00561

Parcel: 132132020


Addresses:

1160 E LIGGINS ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
04/16/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 4-16-26: 1st floor only/not ready-fire foam all penetrations at top plates together with horizontal penetrations from garage into a conditioned space, DWV not under test, a 12" clearance from pex & can lights is required. Either relocate to allow/meet clearance requirements or block,using osb, drywall or plywood, provide supports every 4' for kitchen exhaust. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED.
04/17/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 04/17/2026
All corrections made to prior inspection, walked upstairs.