Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 132132010


Addresses:

1168 E LIGGINS ST


Inspection Status: Requested

Inspection History: COT - RSBU - Roof Nailing 

Permit Number - TC-MDP-0925-00559

Inspection Description - COT - RSBU - Roof Nailing 

Inspection Status - Requested

Date Description Inspector Results Comments
COT - RSBU - Roof Nailing  Requested
01/22/2026 COT - RSBU - Roof Nailing  Not Ready Not ready provide clean work areas . Trade working inside prior to fame approval. 1/22/2026
01/27/2026 COT - RSBU - Roof Nailing  Re-inspection required 1/27/26: Anchor bolts must be spaced at 24"O.C at shear wall 5 at first floor throughout, Anchor bolts required 12" from edge of sill plate, anchor bolts required to be spaced no more then 48" o.c at non-shear walls, anchor bolts at shear wall in garage must be exposed to verify spacing, per detail SD3/3 H2.5 required at floor truss by pwd room 1st floor, per SD3/1 CS16 strap required at 48" o.c at exterior rim blocking, cs16 at garage opening must be 54", shear wall fasteners shall be 3/8" from edge and shall not penetrate more than 1/8", shear wall fasteners must be installed per schedule, anchor bolts required 12" from hold down, 2nd floor holdowns missing throughout and shall be appropriate length with correct number of fasteners, STOPPED INSPECTION MORE ITEMS MAY BE ADDED.