Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | ENGR Engineering Final | Not Ready | Site is good, however outstanding conditions need to be satisfied: -air leakage and duct tightness -post tension slab -Post - installed anchor inspection report -Reinforcing steel and/or pre-stressing tendons -Site preparation |
|
| ENGR Engineering Final | Scheduled |